ASSEMBLY INSTRUCTION
When you open the carton, you will find below spare parts:
STEP 1
Move out the treadmill unit from the packaging box, and place it on the flat ground or floor.
STEP 2
Lift up Left/ Right Uprights(A3L/A3R) by holding Handlebars (A4)as illustrated.Tighten the bottom
of Left/ Right Uprights (A3L/A3R) by using: 2pcs of Button Head Cap Screw M10x60mm (D146).
Then continue to tighten 2pcs of pre-assembled Button Head Cap Screw M10x50mm (D167) right
above the previous assembled screws.
1 Main Frame: 1SET
B11L Left Side Cover: 1PC
B11R Right Side Cover: 1PC
C13 Safety Key: 1 PC
C15 Power Cable: 1 PC
A82Adjustment Wheel:2PCS
B125:
Cover: 2PCS
4