17
4.2. ASSEMBLING
Once the preparation phases have been comple-
ted, the array can be lifted starting with the first two
elements and then adding the remaining pairs, in-
tegrating any supplementary accessories (spansets,
cables, safety locks etc. - chap. 4.3):
1. lift the first two elements already fastened to
the frame and the hoist, keeping the front har-
dware parts of the second element free (this
will make the following step easier - figure 24);
2. align (figures 25 and 26) and fasten (figure 27)
the rear hardware parts of the last hanging
element to those of the first element of the fol-
lowing couple, holding the element by its hand-
les to keep the array in place;
figure 24
figure 25
figure 26 figure 27
All these procedures are to be performed in the
presence of at least two persons.