EasyManua.ls Logo

Outline Superfly - Final Phase

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OUTLINE S.R.L.
Via Leonardo da Vinci, 56
25020 Flero (Brescia) Italy
Tel.: +39 030.3581341
Fax +39 030.3580431
info@outline.it
www.outline.it
20
4.4. FINAL PHASE
Proceed with flying the remaining elements till you
complete the array, making sure that all the locking
pins are positioned correctly.
The last steps to follow are:
1. tie the cables together to create a well-ordered
bundle as the array goes up;
2. once reached the necessary height, fix the array
with the ropes to regulate the vertical and hori-
zontal inclination according to the project;
3. fix the safety lock if used.
The same steps, with the only difference in the au-
dio connector on the rear panel of the loudspeaker,
are to be followed both for Superfly and for Mantas 28.
The total compatibility between their hardware par-
ts (figure 35) allows different configurations as long
as they are approved by OpenArray2 project.
figure 35
figure 36