6
Assembly Instructions cont.
Figure 9
Figure 8
PLEASE NOTE
In severe conditions the tent should be dismantled
Step 8 Guy rope and peg out
Ensure all guy ropes and peg points of the y
and tent are utilised. Make a loop (about 30 –
50cm long) with a slider on the end of the rope
and peg out as far as possible from the tent, as
indicated in Figure 8. Ensure all guy ropes are
attached rmly and remain rm, as indicated in
Figure 9. If required use remaining steel awning
poles to set up front, side or rear awnings.