OPERATING MANUAL CD 2000
Palas
®
GmbH, Karlsruhe, Version V002022014
7. Maintenance
During the application of the discharge unit always make sure that mixing air flow will be
supplied first then the aerosol flow.
When switching off remove aerosol flow first then mixing air flow. Otherwise the ionization
chambers can become contaminated. A high mixing air flow (depending on version, max. 18
or 36 m
3
/h) can clean these chambers .
Dismantling can only be effected by the manufacturer as an exact adjustment of the
components is essential when reassembling it.
The function of the unit can be controlled by measuring the corona current at I
Mon
while
operating. Using the standard settings, there should be shown approx. 0.2 V, which
corresponds to approx. 20 µA.