C. Overload Protection Control
The frequency for the compressor is determined by indoor piping temperature.
D. Outdoor Air Temp Control
One minute after the start-up of the compressor, outdoor air temperature control starts.
E. New JIS Deice Operation
Deice operation starts immediately after the deice instruction is received. But the first deice operation starts 1 hour after the
heating operation is activated.
1. Outdoor heat exchanger temperature is lower than3°C for 30 minutes.
2. Outdoor heat exchanger temperature is lower than -1°C continuously for 3 minutes.
42
CS-PE9CKE / CU-PE9CKE / CS-PE12CKE / CU-PE12CKE