EasyManua.ls Logo

Panasonic KX-A141RUM - 14.3. Adjustment (Charger Unit)

Panasonic KX-A141RUM
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14.3. Adjustment (Charger Unit)
Items Adjustment
Point
Procedure Check or
Replace Parts
(
A
) Charging Check - 1. Connect Charge Contact 12/2W register between charge+ and charge-.
2. Measure and confirm voltage across the regigster is 2.7V ± 0.2V.
D1,R1,R2
Note:
After the measuring, sock up the solder of TP.
The connection of adjustment equipment are as shown in
Adjustment Standard (Charger Unit) (P.45).
14.4. Adjustment Standard (Charger Unit)
When connecting the Simulator Equipments for checking, please refer to below.
14.4.1. Flow Solder Side View
PbF
R1
R2
TP4
TP1
TP2
TP3
Digital Volt Meter
12/2W
(A)
Note:
(A) is refered to ADJUSTMENTS (BASE UNIT AND CHARGER UNIT) (P.39)
45
KX-TCD4 10RUM / KX-TCD410RUS / KX-TCD412RU M / KX-TC D412RUS / KX-A141RUM / KX-A141RUS / KX-A142RUM / KX-A142RUS

Table of Contents

Related product manuals