Items
Adjustment
Point
Procedure
(B) VBACK Status
Confirmation
-
1. Confirm that the voltage between TP18 and GND is 0V ± 0.4V.
(C) BBIC
Confirmation
-
1. BBIC Confirmation (Execute the command "getchk").
2. Confirm the returned checksum value.
Connection of checksum value and program number is shown
below.
(D) Charge Control
Check & Charge
Current Monitor
Confirmation
-
1. Apply 6V between TP5(+) and TP6(-) with current limit of PSU to 200mA.
2. Confirm that the charge current is ON/OFF.
3. SW to decrease current limit of PSU to 100mA.
4. Confirm that the charge current is stable.
(E)
*
Charge Detection
(OFF)
Confirmation
-
1. Stop supplying 6V to TP5(+) and TP6(-).
2. Execute the command "charge".
3. Confirm that the returned value is 0x00 (hex).
48
www.freeservicemanuals.info
Digitized in Heiloo, Holland