EasyManua.ls Logo

Panasonic SC-CMAX5GS - Service Position and Checks; Checking SMPS, Voltage Selector, and Main PCB

Panasonic SC-CMAX5GS
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
9 Service Position
Note: For description of the disassembly procedures, see the Section 8
9.1. Checking of SMPS Module, Voltage Selector P.C.B. & Main P.C.B.
Assembly
Step 1 : Remove Handle Bar Unit.
Step 2 : Remove Rear Panel.
Step 3 : Remove Amp Unit Block.
Step 4 : Remove Main P.C.B. Assembly.
Step 5 : Remove SMPS Module.
Step 6 : Place Main P.C.B. Assembly on Insulated Material.
Step 7 : Remove 4 screws.
Step 8 : Lift up Main P.C.B. Assembly.
Caution 1: Keep the Heatsink Spacer in safe place. Avoid
denting it, place it back during assembling.
Caution 2: Handle the Heatsink & P.C.B. with caution due to
it’s high temperature after prolonged use. Touching it may
lead to injuries
Step 9 : Place Main P.C.B. Assembly on support block.
Step 10 : Connect 4P wire at connector (CN2508) on Main
P.C.B. Assembly.
Step 11 : Connect 30P FFC at connector (CN2506) on Main
P.C.B. Assembly.
Step 12 : Connect 10P wire at connector (CN2511) on Main
P.C.B. Assembly.
Step 13 : Connect 4P wire at connector (CN2510) on Main
P.C.B. Assembly.
Step 14 : Connect 6P wire at connector (CN2507) on Main
P.C.B. Assembly.
Step 15 : Connect 4P wire at connector (CN2604) on Main
P.C.B. Assembly.
Step 16 : Connect 2P wire at connector (JK3503) on Main
P.C.B. Assembly.
Step 17 : Connect 4P wire at connector (JK3502) on Main
P.C.B. Assembly.

Table of Contents

Related product manuals