34
9 Service Position
Note: For description of the disassembly procedures, refer Section 8 of the Service Manual.
9.1. Checking of SMPS/AC Inlet, DAMP, Main and Panel/IR Sensor P.C.B.
Step 1 Place Main and Panel/IR Sensor P.C.B. on the insulated material.
Step 2 Attach 27P FFC at connector (CN2500) on Main P.C.B..
Step 3 Attach 17P FFC at connector (CN2501) on Main P.C.B..
Step 4 Attach 20P FFC at connector (CN2503) on Main P.C.B..
Step 5 Attach 9P Cable at connector (CN2504) on Main P.C.B..
Step 6 Attach 4P FFC at connector (CN3501) on DAMP P.C.B..
Step 7 Attach 4P FFC at connector (CN3502) on DAMP P.C.B..
Step 8 Attach 2P FFC at connector (CN2101) on DAMP P.C.B..
Step 9 Attach 13P FFC at connector (CN2103) on DAMP P.C.B..
Step 10 Remove Fan Unit from Rear Panel.
Step 11 Attach 2P Cable at connector (CN2102) on DAMP P.C.B..
Step 12 SMPS/AC Inlet, DAMP, Panel/IR Sensor and Main P.C.B. can be checked as diagram shown.