PAR T GOLF DOUBLE EAGLE INSTALLATION AND MAINTENANCE MANUAL
D6
SECTION D THE ELECTRONICS
Chapter 7 THE CONTROL CONSOLE
Recommended procedures for installing the control console are outlined in this chapter.
CONTROL CONSOLE INSTALLATION
STEP 1 Place Console to Front of
Platform
–
Position console on right front of platform. Actual positioning of the
console is at the discretion of the facility owner.
STEP 2 Connect USB Cable
Drawing 7C
–
Locate the USB cable and connect to the console as shown.
STEP 4 Connect Optional
Speaker Cable
–
Locate the Speaker cable and connect as shown.
STEP 5 Connect VGA Video cable
–
Locate the VGA video cable; which was attached previously to the
projector mount and connect as shown.
STEP 6 Connect Optional
Auxiliary Video Cable
Locate the auxiliary video cable; which was attached previously to the
projector mount and connect as shown.
STEP 7 Connect AC Power
Locate the console's power cord and connect it to a power source.