EasyManua.ls Logo

Par T Golf Double Eagle Elite Plus 4 - Appendix I Limited Warranty; Appendix II Alternative Golf Games; Index

Default Icon
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION F APPENDICES F18
INDEX
Area Requirements: A3 and Drawing 2A. Par T Optisense™, Installation: D3
Advertising On Screen: F16 Double Eagle
F17 Eagle Stroke
Ball Cup Hole, Location: B4 and Figure 4
Par T Tri-Turf
, Def: B1
Ball Cup, Installation of: D5
Platform: A-1
Cables, Def: D1. Measurements of: A3
Optronet, D4. Bill of Materials for: B2
Putting Light, Installation of: C2 Instructions for: B2
Framing of: B2
Auxiliary Video, C9 Electrical Connections within: B3
SVGA, Installation of: C9 Attaching plywood to: B4 & Figure 4
Cutting out ball cup hole in: B4
Calibration Point, Def: E1; Aiming cameras: E5 Framing courtesy walls on: B4
Attaching Turf to: B11
Attaching Tri-Turf to: B12
Camera Line, Def: E1, Aiming cameras: E5
Camera Sensitivity, Def: E1; Adjusting: F5
Putting Lights, Def: D2; Attachment of: D5
Camera-Field of Vision, Def: E1. Screen, Def: C1; Attaching to Canopy and Frame: C6.
Canopy, Def: C1; Attaching to Frame: C6. Shock Cord, Def: C1; Proper Screen tension: C8.
Changing Golf Courses: E8
Square Tubing, Def: C1
Control Console: D6; Start Play, Steps to: E8
Electrical Outlet for: A5;
Installation of: D6 Sun Light, Avoiding excessive: A2
Connecting cables to: D8
Troubleshooting of: F8 Transformer, When needed: A4.
Maintenance for: F11
Troubleshooting:
Courtesy Walls, Construction of: B4 and Figure 5 Cameras: F4
Control Console and Projector: F6, F10
Dedicated Electrical Circuit, Def: A2, 15 Ampere needed for
simulator: A4.
Optisense: F2
Drive Light, Def: D1; Attachment of: D5 Turf, Putting, Installation procedure: B11
Carpet Adhesive, Def: B11
Practice Option, Using: E9
Upgrade Software, F17
Duplex Electrical Boxes, Def: A1
Wattage, Of each component: A4
Electrical Power Requirements: A4 .
Electrical Outlets, Location of: A4 and Drawing 3A; Installation
of: B3.
Frame, Assembly of: C2.
Hacker Guard, Def: D1
Lighting Requirements: A5
Power Switches, Def: A1; Location of: A4.
Optisense™ Cameras & Infrared Lights, Aiming and
aligning: E5; Troubleshooting: F2; Maintenance for: F11.