EasyManua.ls Logo

ParaBody 415101 - Assembly Steps - Part 5; Step 9: Install New Cable Assembly; Step 10: Loop New Cable

ParaBody 415101
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FIGURE 9
Cable must run over the top of bolts.
Loop CABLE (16) around one 3-1/2" PULLEY (5) in the PULLEY
BRACKET (2) using on 3/8 X 1-3/4" BOLT (13) and 3/8"
LOCKNUT (11) as shown in FIGURE 10.
STEP 10
Screw the threaded end of CABLE (16) into the HEAD PLATE
ASSEMBLY.
3/8 X 1-3/4"
STEP 9
Install the NEW 112-3/4" CABLE ASSY (16) using the following steps:
¯ Route the CABLE (16) through the TOP BOOM as shown in FIGURE 9. The pulleys in TOP BOOM may need to be temporarily
removed to perform this step. (Note: Make sure the CABLE is running OVER the BOLTS connecting the FRONT UPRIGHT
to the TOP BOOM. These may also have to be removed to perform this step.)
, Route the CABLE (16) around the PULLEY BLOCK as shown in FIGURE
¯ Route the CABLE (16) back over one pulley in the TOP BOOM, down through the PULLEY BRACKET (2) and over the second
pulley in the TOP BOOM. FIGURE 10

Related product manuals