EasyManua.ls Logo

ParaBody 425 - Page 26

ParaBody 425
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
S|ep 4
A.
To ~ssemble the PEC DEC CABLE (110), follow the cobble routing diagram on drawing, and use
the following steps:
~Assemble each end of the PEC DEC CABLE (110) to the PEC CAMS (9).
*~Drope the CABLE (110) over the ~PULLEYS on the CENTER PULLEY BRACKET (10). (THIS
FORM A LOOP IN THE CENTER OF THE CABLE)
*Position the CABLE RETAININO CLIPS (57) in a 45 DEGREE position over the PULLEYS alqd the
CABLES, and ~ighten the two PULLEY connections SECURELY.
B.
To assemble the AB CABLE (111), follow the cable routing diagram on drawing, and use
the follow~ng s{eps:
~LOOSELY assemble ~he PULLEY BRACKET (59) fo ~he AB CABLE (111) as shown in drawing using
two I/4 IN. WASHERS (80), one two 1/4-28 IN. NUTS (81). (LOCATE PULLEY BRACKET
HALFWAY UP ON THE THREADS OF THE AB CABLE. DO NOT TIGHTEN NUTS AT THIS TIME)
~Make a loop with the PEC CABLE (110) and attach the PULLEY BRACKET (59) to ~he F’EC CABLE (110)
using one 3-1/2 X 1 IN. PULLEY (100), one 5/8 X 2 IN. BOLT (76), ~wo 3/8 IN. WASHERS (69),
and one 3/8 IN. LOCK NUT (91).
(CONTINUED ON NEXT PAGE)
2 5 6
I i , i I I
27

Related product manuals