EasyManua.ls Logo

Paragon Apex - Kettle Installation -> Need Photos for Steps; Electrical Requirements; Action Items before Operating Your Machine

Paragon Apex
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 9 paragonconcessions.com
Kettle Installation
1. Unpack the kettle
2. Clean the kettle (see Cleaning and Care Instructions)
3. Place kettle onto the retaining hanging hook arm slots
4. Allow the kettle to swing into place aligning the gears to meet and return into an upright
operating position
5. Ensure the collars are outside the hanger arms
Electrical Requirements
Electrical Requirements Model No. 2011 Series The following power supply must be provided: 2011
Series: 120/208 V~ or 120/240 V~, 5752 W, 60 Hz Units are designed to operate on single phase, 30
AMP, 4 wire supply, 120/208 or 120/240 V~ (2 Hot, 1 Neutral, 1 Ground). All electrical components in
this machine are 120 V (motors, heat elements, lights, etc.) and therefore require “Hot to Neutral”
connection (NOT “Hot to Hot”). A 30 AMP wall receptacle (NEMA L14-30) is supplied with the machine.
The receptacle will accept the attachment plug on the machine and must be used, reference the
Receptacle Wiring Diagram for NEMA L14-30 for receptacle installation instructions.
Action Items Before Operating Your Machine
1. Make sure all machine switches are OFF before plugging equipment into receptacle.
2. Make sure wall outlet can accept the grounded plugs (where applicable) on the power supply cord.
3. The wall outlet must have the proper polarity. If in doubt, have a certified electrician inspect the
outlet and correct if necessary.
4. DO NOT use a grounded to un-grounded receptacle adapter (where applicable).
5. Install unit in a level position.

Related product manuals