EasyManua.ls Logo

Parker Parkrimp 2 – 83CE-083U - Operation; 5.1 First commissioning

Parker Parkrimp 2 – 83CE-083U
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hose Crimper Machine Parkrimp
®
2
Bulletin 4480-T12/UK
Operation
5-1
5 Operation
5.1 First commissioning
Figure 5-1 Mounting the
guard hood
Figure 5-2 Oil
Figure 5-3 Level indicator
Figure 5-4 Direction of rota-
tion of motor
Remove the transport lug.
Mount the guard hood using the four screws in the fastening
holes.
Fill in 40 litres of hydraulic oil HLP 46 DIN 51524 (5) – the oil
level is then in the centre of the level indicator.
Connect the plant to the power supply.
Check the direction of rotation of the motor – if necessary reverse
two phases.
Ventilate the plant – move the pusher several times up and down.
Operation
5-1

Related product manuals