Commissioning and handover protocol
Customer data
Name: First name: Tel.:
Street: Postcode: Town/city:
Construction project:
Unit type: Serial no.: Year of construction:
Completeness
No. Components Implementation Result
1 Supply air duct
- Design as planned
- Cleaning option provided
yes / no
yes / no
2 Supply air vents
- Arrangement as planned
- Design as planned
- Cleaning option provided
yes / no
yes / no
yes / no
3 Overflow air vents
- Arrangement as planned
- Design as planned
yes / no
yes / no
4 Extract air vents
- Arrangement as planned
- Design as planned
- Cleaning option provided
yes / no
yes / no
yes / no
5 Extract air duct - Cleaning option provided yes / no
6 Extract air fan - Cleaning option provided yes / no
7 Control / regulation system - Operational yes / no
8 Filter, optional
- Replacement or
cleaning option provided
yes / no
9 Heat exchanger for waste heat recovery - Cleaning option provided yes / no
10 Documentation - Available yes / no
Function
1
Operational with rated ventilation, as
planned
Result OK
Action required
yes / no
yes / no
2 Switching steps possible, as planned
Result OK
Action required
yes / no
yes / no
3 Electrical power consumption
Result OK
Action required
yes / no
yes / no
Record of confirmation
Date: ................................. Signature/stamp:....................................................................................................
Commissioning personnel / installation technician