EasyManua.ls Logo

PAX S920 - Page 4

PAX S920
4 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
You need to ship your original terminal and charging cables back using the
packaging and mailing label provided.
REMINDER
ePAYP2PE_PAXS920QRGRedeployment071019
What’s included:
Connecting your terminal:
S920 charging cable
Charging dock and power cord*
*This must be added on to your original order. Additional fees will apply.*
To charge your terminal you can either: 2.
You will also need to charge your
charging dock with the power
cord included.
Place it on the charging dock. Connect it to the charging cable.
OR
1. Verify your bag number in your ePAY portal https://epay.jtpyportal.com to
ensure you have received the correct terminal. For more information on where to
conrm your bag number, please refer to page 9 on our P2PE Instruction Manual
(PIM), which can be found at: https://www.jetpay.com/pim.
Note: Before proceeding, please ensure your S920 packaging has not been tampered with.
Point to Point Encryption (P2PE)
Immediate data encryption keeping your clients data secure.
Technical Requirements:
Standard 110 volt power outlet
An ethernet switch port for each device
A xed IP address on your internal network that is reachable from the workstation
that will be used for payment processing

Other manuals for PAX S920

Related product manuals