Do you have a question about the PB EC Series and is the answer not in the manual?
Covers draft requirements, barometric draft control, and compliance with installation standards for safe venting.
Guidance on steam pipe sizing, Hartford Loop, swing joints, and header placement.
Details piping methods for supply and return, and protection against condensation.
Covers water boiler controls, steam boiler controls with float or probe low water cut-offs.
Instructions for mounting junction box, connecting harnesses, and using Heyco bushings.
Details burner mounting, gasket placement, oil supply, and burner specifications.
Guides on initial burner start-up, safety checks, and adjusting draft controls.
Procedures for checking limit, operating, and low water cutoff controls.
Annual inspection by a professional, boiler cleaning, and vent system inspection.