EasyManua.ls Logo

PB EC Series - If a Long Shutdown Is Required

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
MAINTENANCE
d. Remove any scale or soot from the combustion
chamber area by vacuum cleaning or any other
available means.
e. Replace flue baffles (Refer to Section 2.B).
f. Replace flue collector and close burner mounting
plate, making sure all gaskets are in place.
g. Replace jacket top panel.
2. Inspect venting system.
3. For systems using anti-freeze, the glycol solution
should be tested at least once a year and as
recommened by the glycol manufacturer.
G. IF A LONG SHUTDOWN IS REQUIRED
1. To take boiler out of service if the boiler and system
are not to be used when temperatures are below
freezing:
a. Drain the boiler and system completely and shut
off make-up water supply.
b. Open main line power disconnect switch to
boiler. Remove the fuses or secure the switch so
that the power cannot be turned on accidentally.
2. Be certain that the boiler and system are refilled
before returning to service.
Burner mounting plate must be opened to facilitate
this operation.
NOTICE
All cover plates, enclosures, and guards must be
maintained in place at all times, except during
maintenance and servicing.
NOTICE
Always keep the manual fuel supply valve shut off
if the burner is shut down for an extended period of
time.
CAUTION