D. Lay down two columns on the installation site parallelly, position the powerside
column according to the actual installation site. Usually, it is suggested to install
powerside column on the front-right side from which vehicles are driven to the lift, then
install the top plate (See Fig.13).
Assemble top-plate
using M12*30 hex bolt
with nut and washer.