E. POWER SUPPLY
The electrical source must be 3Kw minimum. The source cable size must be 2.5mm²
and in good condition of contacting with floor.
III. STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter’s chalk line to establish installation layout of baseplate (See Fig. 6).
C. Check the parts before assembly.
1. Packaged lift and hydraulic power unit (See Fig. 7).
Fig. 7
2. Move the lift aside with fork lift or hoist, and open the outer packing carefully
(See Fig. 8).