22
100
80
60
40
0
06 12 18
20
24
t
Home
16-04-13 10:12:17
Power
Today
Current
kWh
0.01
W
1218.9
299.1 V
229.5
V
S/N:
Master DSP SW:
HCI MCU SW:
After connecting to AC and DC
power the inverter presents the
screen on the left.
• Press OK to start
commissioning.
• Select the language.
• Press OK to conrm.
• Select the country.
• Press OK to conrm.
YYYY
Left/Right: Move selection
Up/Down: Increase/Decrease Value
End Commissioning
Date/Time
- - -
• Specify Date and Time.
• Press OK to conrm.
End of Commissioning:
• Press OK to conrm.
The inverter performs self-tests
and checks the AC-grid.
The inverter starts operation after
a few minutes.
See page 11 for changing the
settings.
987654000
V1.83
V1.10
Slave DSP SW: V1.83
Press OK to start commissioning.
Chinese English
Language
Press OK to conrm.
Country
DE - VDE 4105
MM DD
2 0 1 6 - 0 1 - 1 5
hh mm
0 0 : 0 0
Press OK to conrm.
Press OK to conrm.
Press OK to start running
Press ESC to return
EN
Commissioning
Press Esc to Main Menu
IT - CEI 0-21
AU - AS 4777
ES - RD 1699
CZ - EN 50438
GR - Islands
GR - Continent
NL - EN 50438
Current Country:
DE - VDE 4105
Press OK to conrm
Current Country:
DE - VDE 4105
German Reserved
Reserved
Reserved
Reserved
Reserved
French
Spanish
Italian
Polish
kWh
4.10
49.99
Hz
297.9 V
10.0 kWh (%)
Normal
Total