EasyManua.ls Logo

Pella 6000 - Storm Door Installation - Continued; Positioning Door and Securing Bottom Expander; Securing Hinge Side and Support Block Placement

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Factory
Drilled
Holes
This is
the TOP
of Your
Door
Inside
Facing
UP
Remove any protective film.
Slide boom expander
tight onto boom of door.
Secure with screws
(Bag taped inside expander).
#6 x 1/2” Pan Head
(Extra screw provided)
Qty.
2
Use a HAND
Screwdriver
8
9
4
Continued from Page 3
7
Position door for
LEFT hinge or
RIGHT hinge.
RIGHT HINGE DOORS
position metal plate
on this side.
10
Place
installation
support block
on doors
HINGE side.
Left Hinge
Right Hinge
Left Hinge
Illustration
Inside
Facing
UP
This is
the TOP
of Your
Door
LEFT HINGE DOORS
position metal plate
on this side.
Slide
Slide
Right
Hinge
Illustrated
Continued
on page 5

Related product manuals