EasyManua.ls Logo

Pella 6000 User Manual

Default Icon
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Hardware
Kit(s)
Loose Parts
(In Roll-up)
Loose
Parts
Lay door flat.
Before discarding the carton, make sure ALL parts are
accounted for -- check in carton roll-ups.
Carton
Roll-up
Carton
Roll-up
The carton material is recyclable
Phillips
Screwdriver #2
Pencil
Power Drill with
3/32” drill bit
Tape Measure
1
2
Tools required
Scissors
Follow the steps in order, from 1 to 35.
Legend
RED objects are the action items for that step.
Steps in BLUE apply to LEFT HINGE configurations ONLY.
(Hinge side will be determined in a later step.)
Steps in GREEN apply to RIGHT HINGE configurations ONLY.
(Hinge side will be determined in a later step.)
Insert
MUST READ!
Instructions in this box style are IMPORTANT!
1
3
2
NEW
Installation
Procedure.
Follow this manual for
a fast and proper
installation.
Part Number:
33258
Read the legend below in order to easily follow along and install your storm door.
For reference, the storm door assembly is illustrated on page 2.
Owners Guide and Installation Manual
PELLA
®
EXPRESS INSTALL
STORM DOOR MODELS
To order replacement parts, call
1-800-374-4758
or visit us at
www.pella.com
Please have your registration number
ready when you contact us either by
telephone or on the internet.
NOTE TO THE INSTALLER: This Owner's Guide and Installation Manual is the property of the
homeowner. Please leave it with the homeowner upon completion of the installation.
TROUBLE SHOOTING GUIDE
is located on page 12 of this manual
For safety reasons, the assistance of a second person is recommended when handling the door.
Question and Answer IconNeed help?

Do you have a question about the Pella 6000 and is the answer not in the manual?

Pella 6000 Specifications

General IconGeneral
Energy EfficiencyENERGY STAR certified
WarrantyLimited lifetime warranty
MaterialFiberglass
Glass OptionsLow-E
StylesTraditional
Color OptionsWhite, Black
Security FeaturesMulti-point locking system

Summary

Storm Door Installation Procedure

Initial Frame Preparation and Alignment

Steps 1-5: preparing the door, centering the header frame, and aligning with brickmold.

Hinge Orientation and Mounting Frame Setup

Step 6: determining hinge side and proceeding with initial frame securing.

Storm Door Installation - Continued

Positioning Door and Securing Bottom Expander

Steps 7-8: positioning the door for hinges and attaching the bottom expander.

Securing Hinge Side and Support Block Placement

Steps 9-10: securing the expander and placing a support block on the hinge side.

Storm Door Frame Mounting

Attaching Door Frame to Entryway

Steps 11-12: setting the door in the opening and predrilling for hinge attachment.

Securing Jamb and Removing Support Block

Steps 13-14: predrilling for jamb screws and removing the installation support block.

Installing Panels and Final Frame Securing

Glass Panel and Retainer Strip Installation

Step 15: installing the glass panel and retainer strips.

Door Frame Adjustments and Handle Installation

Closer Installation and Preparation

Closer Operation and Adjustment

Final Door Adjustments and Operation

Related product manuals