EasyManua.ls Logo

Pentax K-r - Page 39

Pentax K-r
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
77420 - 38/107 -
10Lead wires on bottom side
①Solder 6 lands
②Solder 6 lead wires
③Solder 4 land
Arrange lead wires as shown in figure.
11. [Confirmation] Height of SR block base support pillar.
[Required equipment]: Block gauge for 35mm, Dial gauge comparator, etc. (same as K100D)
Measure height of 0-C000 base support pillar (3 places) from the mount surface as shown in the figure.
Tolerance (In common with 77310):
50.1+0.17/-0.13 mm
Using block gauge for 35mm (45.46mm):
4.514.81 mm
+0.51 (+4)0.81 (+4)
+4
G100 (T72)
T940 (AF-SW) S300 (T31)
DT(7x10)

Other manuals for Pentax K-r

Related product manuals