EasyManua.ls Logo

Perle IDS-710 - Appendix E - IDS Maintenance

Perle IDS-710
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
IDS-710 Hardware Installation Guide
Appendix E - IDS Maintenance
Ensure there is clearance of 50.8mm (2 inches) on all sides of the IDS switch to pro-
vide proper airflow through the unit
Do not use solvents or cleaning agents on this unit
Keep vent holes clear of debris
If case gets dirty wipe with a dry cloth
Ensure all cables are in good working condition
Replace any frayed cables or cables without clips