EasyManua.ls Logo

PFREUNDT WK60 Series - Forced zeroing and warm-up strokes

PFREUNDT WK60 Series
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
www.pfreundt.de
5.3 Forced zeroing and warm-up strokes on demand
There are several situaons in which compulsory zeroing may be required:
If the current oil temperature deviates by 10°C from the last measured value.
The oil temperature is measured and stored at each zeroing
At the latest 30 minutes after the last zeroing.
Depending on the conguraon, you will be prompted to zero the scale again.
Warm-up strokes
Depending on the conguraon, you will also be asked to perform some warm-up
strokes with the bucket before zeroing. This is to ensure an opmum operang
temperature (oil temperature) in the hydraulics.
If the corresponding warning appears in the display, proceed as follows:
1. Carry out the current weighing
if there is sll material in the
bucket.
2. Lower the liing arm and raise
the empty loading bucket com-
pletely.
3. Move the liing arm through the
weighing posion from below
several mes (e.g. 10 mes).
10 x
4.
Connue with (depending on the
conguraon):
Zeroing the scale
Perform a weighing
Weighing posion