PHI 5000 LATTE GO / GO+ 08 DISASSEMBLY
8/7
7.11. Flow-meter
Lift the ow meter out of the casing assembly and remove the electrical
and water circuit connections.
Unscrew the screw shown and remove the
electrical and water circuit connections.
Unscrew the screw shown at
unthread the support boiler
7.12. Boiler
7.10. Pump
Disconnect the water circuit connections (A) and
electrical connections (B), loosen the safety valve (C) and
slide the pump off the brackets (D).
Unhook the pump
from the supports.
C
D
D
A
A
A
B
B
B