SECTION 4 ALIGNMENT PROCEDURE
Section 4 Page 1
4.1 TEST EQUIPMENT 1
4.2 GENERAL INSTRUCTIONS 1
4.3 PRELIMINARY ADJUSTMENTS 1
4.4 TEST FREQUENCY TABLE 2
4.4.1 Selcall Encode Test 3
4.5 THE PROCEDURE 4
4.5.1 VCO Alignment 4
4.5.2 Transmitter Power Adjustment 4
4.5.3 Reference Oscillator Tuning 5
4.5.4 UHF Receiver Front End Alignment 6
4.5.5 VHF Receiver Front End Alignment 7
4.5.6 Mute Maximum Alignment 8
4.5.7 Transmit Modulation Alignment (No CTCSS) 9
4.5.8 Transmit Modulation Alignment with CTCSS 10
4.5.9 Transmit Modulation Alignment with Selcall 11
SECTION 5 INSTALLATION INSTRUCTIONS
Section 5 Page 1
5.1 GENERAL INFORMATION 1
5.1.1 Operator Access 1
5.1.2 Location Dangers 1
5.1.3 Vehicles Fitted With Electronic Devices 1
5.1.4 Specialised Vehicles 2
5.1.5 Dash Mounted Equipment 2
5.1.6 Petrol Powered Vehicles 2
5.1.7 Gas Powered Vehicles 2
5.2 MAIN UNIT FITMENT 3
5.2.1 Cradle Installation 3
5.2.2 Transceiver Fitment 3
5.2.3 Transceiver Removal 3
5.2.4 Microphone Installation 3
5.2.5 Microphone Removal 4
5.2.6 Torque Settings for Retaining Screws 4
5.3 ANTENNA INSTALLATION 4
5.4 DC SUPPLY CONNECTION 4
SECTION 6 COMPONENT SCHEDULE
Section 6 Page 1
6.1 W1 BND, 3Ch, 25kHz STD. 1
6.1.1 Front Panel Assy Compl 1
6.1.2 Control Brd (std) Compl 1
6.1.3 Radio Brd W1 25kHz Comp 4
6.1.4 Common Parts 10
6.2 OPTIONS 10
6.2.1 CTCSS And RTB 10
SECTION 7 DIAGRAMS Section 7 Page 1
7.1 List of Illustrations 1
(ii)