EasyManua.ls Logo

Pit Boss PB1000PL - Mounting the Front Legs to the Main Barrel; Installing the Cart Front Panel

Pit Boss PB1000PL
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
8
2.        
Parts Required:
1 x Main Barrel /Hopper Assembly (#11)
1 x Left Support Leg / Front (#20)
1 x Right Support Leg / Front (#22)
6 x Screw (#A)
Installation:
• Mount the Front-Right Support Leg to the floor end of the Main Barrel
using three screws through the three pre-drilled holes. Install screws
from the inside of the Main Barrel. Next, mount the Front-Left Support
Leg to the hopper end of the Main Barrel using three screws through the
three pre-drilled holes. Install screws from the inside of the Main Barrel.
IMPORTANT: Do not tighten screws completely until bottom shelf is
installed in future step.
3.     
Parts Required:
1 x Cart Front Panel (#17)
2 x Screw (#A)
5 x Screw (#C)
Installation:
• Install the Cart Front Panel to the two Front Support Legs using five
screws (C) as follows: two screws in each Support Leg and one screw into
the Ash Clean-out Tray. Note illustration 3A.
• Affix the Cart Front Panel to the Main Barrel, from the inside, using two
screws (A). Note illustration 3B.
3
3
17
17
2
20
11
22

Table of Contents