EasyManuals Logo

Pitco TB-SRTG User Manual

Pitco TB-SRTG
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
TB-SRTG: Gas Floor Model Rethermalizer INSTALLATION
L20-376, rev. 1 (08/18) 9
1) Probe
2) High Temperature Limit
1.8. INSPECTION
Before you begin filling and adjusting the appliance, perform the following visual checks:
After the appliance is in its permanent location, check the levelness. Any additional leveling that
is necessary can be performed as previously described.
Ensure that the probe, and high temperature limit is in place and secure. Check the high limit
bulb mounting screws to ensure that they are tight.
Review the installation portion of this manual and ensure that all steps have been followed and
executed properly.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pitco TB-SRTG and is the answer not in the manual?

Pitco TB-SRTG Specifications

General IconGeneral
BrandPitco
ModelTB-SRTG
CategoryCommercial Food Equipment
LanguageEnglish

Related product manuals