X P 1 M I N S T A L L E R G U I D E
2
Introduction
Introduction to the scope of this document and conventions used
throughout the manual.
his manual assumes very little understanding of PLAN access control
systems specifically, however, some aspects of the panel installation
and commissioning process (such as mains connection, lock and reader
termination and PC networking) will require a degree of experience in
security systems installation and a basic knowledge of computers and the
Microsoft Windows operating system.
Note: This guide is not intended to be a definitive installation manual for
installing access control systems. The installer is expected to have a
level of installation expertise and experience appropriate to the scale and
complexity of the project at hand.
At all times the prevailing local safety regulations and codes of practice
should take precedence and be applied to the installation of this system.
This document is intended for guidance on the installation and commissioning
of the XP1M Access Control Door controller only. The manual is intended
for installation personnel, project managers and people with similar
responsibilities.
For speed and ease of understanding the XP1M will be referred to in this
document as the ‘System’, and the engineering personnel who carry out the
installation of the system will be referred to as ‘installers’ or ‘users’.
The XP1M is expected to operate as part of an on-line system - connected to a
PC running appropriate PLAN software. For detailed guidance on the use and
operation of the the Software, please consult the relevant user manual (supplied
separately).