EasyManua.ls Logo

Planet GSW-1820HP - Hardware Installation; Rack Mounting

Planet GSW-1820HP
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
5. Hardware Installation
5.1 Rack Mounting
To install the 802.3at PoE+ Switch in a 19-inch standard rack, follow the
instructions described below.
Step 1: Placeyour802.3atPoE+Switchonahardatsurface,withthefront
panel positioned towards your front side.
Step 2: Attach a rack-mount bracket to each side of the 802.3at PoE+
Switch with supplied screws attached to the package. Figure 5-1
shows how to attach brackets to one side of the 802.3at PoE+
Switch.
GSW-2824P
PWR
1
2
3
4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
26
25
28
27
27
28
Standard
VLAN
Extend
24-Port 10/100/1000T 802.3at PoE
+
2-Port 10/100/1000T
+
2-Port Gigabit TP/SFP Combo Ethernet Switch
10/100
1000
LNK/ACT
LNK/ACT
PoE-in-Use
1000X SFP
1 3 5 7 9 11 13 15 17 19 21 23
2
PWR
4 6 8 10 12 14 16 18 20 22 24
25
26
GSW-2620HP
PoE-in-Use
ACTLNK1000
ACTLNK10/100
PoE-in-Use
ACTLNK1000
Standard
Extend
VLAN
25
18 20 22 24
17 19 21 23
10 12 14 16
9 11 13 15
2 4 6 8
1 3 5 7
26
24-Port 10/100/1000T
802.3at PoE
+
2-Port 1000X SFP Gigabit Ethernet Switch
Figure 5-1: Attaching the Brackets to the 802.3at PoE+ Switch.
You must use the screws supplied with the mounting brackets.
Damage caused to the parts by using incorrect screws would
invalidate the warranty.
Step 3: Secure the brackets tightly.
Step 4: Follow the same steps to attach the second bracket to the opposite
side.

Related product manuals