EasyManua.ls Logo

Planet IVC-2004PT - Page 19

Planet IVC-2004PT
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
Control Center
Harbor
Railway
Steel Factory
Switch
IVC-2004PT Master
IVC-2004PT Master
IVC-2004PT Master
VC-202A/VC-201A CPE+
MC-700 Chassis
1.4km
2.4km
2.4km
VDSL2
VDSL2
VDSL2
PoE IP Camera
PoE IP Camera
PoE IP Camera
PoE IP Camera
PoE IP Camera
PoE IP Camera
VDSL2 Coaxial Cable
VDSL2
VDSL2 Telephone Wire
VDSL2
100Base-TX UTP
PoE
100Base-TX UTP with PoE
PoE
PoE
PoE
PoE
PoE
PoE
Figure 3-4: IVC-2004PT Application Topology
To decide where to put the IVC-2004PT, you must ensure:
t It is accessible and cables can be connected easily.
t Cabling is away from sources of electrical noise such as radios,
transmitters and power lines and uorescent lighting xtures
t Water or moisture must be avoided.
t Air Flow around the unit and through the vents in the side of
the case is not restricted (A minimum of 25mm inch clearance is
recommended.).
To prolong the operational life of your units:
t Do not place objects on top of any unit or stack.

Related product manuals