Step 7 - Fascia installation
2. Plug the OEM button panel
harness into the back of the
OEM button panel
1. Connect PLUG B & E into the
back of the RW50/15
interface screen
3. Make sure all the cables are
tucked away neatly before securing
into place.
4. Rest the unit in place, test all
features first and then gently push
fascia panel back into position
5. Plug the OEM Air conditioning
control harnesses into the back of
the air conditioning control panel
6. Gently push air conditioning
controls back in.
7. Reposition Glove Box
10