Safety Recommendations
To prevent injury to personnel and/or damage to property, always follow your workplace’s safety procedures
when operating this equipment. You should also comply with the following safety recommendations:
•
Always connect the power cord on this unit to a grounded (3-prong) power outlet. Make certain that the
outlet is the same voltage and frequency as your unit.
• Never operate the unit with a damaged power cord.
• Always turn the unit OFF and disconnect Mains power before performing any maintenance or service.
Unpacking Your Chiller
Your Chiller is shipped in a special carton. Retain the carton and all packing materials until the unit is
completely assembled and working properly. Set up and run the unit immediately to confirm proper operation.
Beyond one week, your unit may be warranty repaired, but not replaced. If the unit is damaged or does not
operate properly, contact the transportation company, file a damage claim and contact the company where
your unit was purchased immediately.
CAUTION: Keep unit upright when moving. Be sure to follow your company’s procedures and practices
regarding the safe lifting and relocation of heavy objects.
Regulatory and Compliance Testing
CSA UL (60Hz units)
CAN/CSA C22.2 No. 61010-1-04 — Safety Requirements for Electrical Equipment for Measurement, Control
and Laboratory Use, Part I: General Requirements.
CAN/CSA C22.2 No. 61010-010-04 — Safety Requirements for Electrical Equipment for Measurement,
Control and Laboratory Use - Part 2-010: Particular Requirements for Laboratory Equipment for the Heating
of Materials.
UL Std No. 61010-1 — Electrical Equipment for Laboratory Use, Part I: General Requirements.
UL Std No. 61010A-2-010 — Electrical Equipment for Laboratory Use, Part 2: Particular Requirements for
Laboratory Equipment for the Heating of Materials.
CE (50Hz units)
EC Low Voltage Directive 2006/95/EC
EC Electromagnetic Compatibility Directive 2004/108/EC
IEC 61010-1-2001
IEC 61326:2005 / EN 61326 : 2006
Contents
The following items have been included with your Chiller:
• Operator’s Manual
• IEC Power Cord
• Two sets of Inlet/Outlet Adapters: 1/2 inch NPT to 1/2 inch hose barb;
1/2 inch NPT to 3/8 inch hose barb
3
110-445