EasyManua.ls Logo

Polytec PSV 300 - Page 37

Polytec PSV 300
105 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...


 

20.20. If required, connect tIf required, connect the hand set PSVhe hand set PSV-Z-051 to the 12-pin circular jack-Z-051 to the 12-pin circular jack
REMOTE CONTROL on the front of the scanning head.REMOTE CONTROL on the front of the scanning head.
  

21.21. If appliIf applicablecable, plug the, plug the
  
cable from the connector box of thecable from the connector box of the
optional pan-tilt stage into the 4-pin circular jack on optional pan-tilt stage into the 4-pin circular jack on the underside of thethe underside of the
scanning head.scanning head.
22.22. PlPlug thug thee

cable from the cable from the connector box of the pan-tilt stage intoconnector box of the pan-tilt stage into
the circular jack on the circular jack on the pan-tilt stage.the pan-tilt stage.


23.23. Plug a mains cable into the back of the workstatiPlug a mains cable into the back of the workstation and into a wall socketon and into a wall socket
providing protective grounding.providing protective grounding.
24.24. Plug a mains cable into the back of the juncPlug a mains cable into the back of the junction box and into a wall sockettion box and into a wall socket
providing protective grounding.providing protective grounding.
25.25. Plug a mains cable into the back of the controPlug a mains cable into the back of the controller and into a wall socketller and into a wall socket
providing protective grounding.providing protective grounding.
26.26. If applicable, plug a mains cabIf applicable, plug a mains cable into the connector box of the pan-tiltle into the connector box of the pan-tilt
stage and into a stage and into a wall socket providing protective grounding.wall socket providing protective grounding.
The PSV is now completely installed. Carry out a functional test as describedThe PSV is now completely installed. Carry out a functional test as described
ininse
sectctionion 3.53.5..

check the setting of the voltage selectors on the back of the workstation and thecheck the setting of the voltage selectors on the back of the workstation and the
controller as well as the rating of the fuses on the back of the controller and the junction boxcontroller as well as the rating of the fuses on the back of the controller and the junction box
connecting to the mains!connecting to the mains!

check the setting of the voltage selector on the connector box of the pan-tilt stagecheck the setting of the voltage selector on the connector box of the pan-tilt stage

connecting to the mains!connecting to the mains!

Related product manuals