SERVICE MANUAL
Page 23
Service manual Jetstream Mk3 - V. 1.0 - 11-02-08 Approved by: JN
JETSTREAM Mk3 - Mk3
9. SETTINGS AND ADJUSTMENTS
Property 1st stage Setting common units Setting US units
P1 300 bar 4351 psi
P2 > 7.5 bar >109 psi
P3 20 bar 290 psi
P4@p1, 8.5bar 123 psi
P5 > 7.5 bar >109 psi
i +/- 1.1 bar +/-16 psi
R max 1 bar max 15 psi
Q 2 L/min 0.07 ft
3
/min
Internal leaktightness 12 ml/h*
* Corresponds to a pressure climb of
0,01 bar/min for a regulator with a 70
cm hose.
1) Open right valve HP (200-300bar)
2) Purge
3) Check IP (go to item 10 if OK)
4) Purge
5) Adjust IP (1/2 turn = 1.5 bar)
6) Open right valve
7) Check IP (loop to 4)
8) Close right valve
9) Purge
10) Open left valve (20 bar)
11) Check IP
12) Close left valve
13) Purge
FIRST STAGE ADJUSTMENT