Document Operating and Maintenance manual, AC200
Reference No. 164571
Revision A
Date 23-JUL-2021
Author AK
Power Prove www.powerprove.com
Leicester. LE5 5LZ. United Kingdom sales@powerprove.com
a division of Cressall Resistors Ltd. +44(0) 116 249 1722 Page 2 of 12
Operating and maintenance manual
200kW load bank rated at 400V AC 3-phase with 5kW steps
Figure 1 - Product photo.
1) Warnings
Prior to use
Operators of this equipment should be of suitable competency to perform electrical testing and must have read and
understood this document.
First use
ELECT RIC S H OCK H A ZARD ! Electric shock can lead to severe injury or death. If the load bank has been
damaged in transit, do not operate until a competent technician inspects the unit and
determines that it can be operated safely.
Check the equipment for obvious damage. Document and report any exterior damage immediately.
During use
Review the safety requirements stated this document (Section 3) before using the equipment.
FIRE AN D B URNS H A ZARD ! When using the load bank, the exit grill and adjacent covers will become
hazardously hot to touch and remain hot for approximately after testing is
completed, whilst the load bank performs its cooling down period. The exiting air
will also be hot ~100°C above ambient at 1m from the exit grill.