EasyManua.ls Logo

Power 8ft - Finishing Touches

Power 8ft
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Finishing Touches
1. Using the 40mm galvanised nails, fit the bargeboards, which are 70mm wide, to the high side and ends of
the roof. Again, these may need cutting down with a saw depending on what size building you have.
Important!
There is no bargeboard for the low side as it could trap rainwater from running off the roof.
2. Secure cover lats which are 58mm wide, at each corner of your Power shed with 40mm nails (at least four
per strip). Extra strips are provided to cover the joins between side wall panels.
3. Secure the door pull to the door with 25mm screws.
4. Ensure there are no overhanging branches or debris on the shed as this can lead to water ingress.
Please be aware, this will need to be checked regularly as part of the maintenance of the shed.
5. Peel the protective blue sticker off the Power branding plate above the door.
Page 18 of 21

Related product manuals