EasyManua.ls Logo

Power 8ft - Pre-Assembly

Power 8ft
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The Fixing Pack
Your fixing pack will include:
25mm screws (silver)
35mm screws
50mm screws
70mm screws
Clout nails (for the felt)
40mm galvanised nails
If you have ordered a Power Base, you will also receive 80mm and 100mm screws.
Please note 35mm screws are not needed for a pent
(This is a standard pack used for both pent and apex sheds)
On the rare occasion that not enough screws are provided please contact us and make us aware so we
can send more out to yourself. Please be aware we are unable to reimburse if you purchase your own.
Pre-Assembly
1. Safely unpack your components and check that you have all the parts required.
Please use the table in the two previous few pages to view which components are required for the size
you have ordered.
2. Carefully remove the pallet and any untreated packing timber.
See the aftercare section on ways to recycle these items or alternatively you can discard them.
3. Remove any transport blocks from the bottom of the blank and window panels. These are there to
offer further protection to the bottom board of the panel.
USEFUL TIP!
Re-treat the underside of the floor before assembly for additional protection and maximum longevity.
Drilling
In the instructions we will talk about screwing panels together. We recommend this is done with a drill.
We suggest that you pre-drill the timber with a 3mm drill bit before inserting the screws.
This will minimise the chance the timber will split.
Page 8 of 21

Related product manuals