EasyManua.ls Logo

Precor P20 Console - Page 72

Precor P20 Console
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22 Assembling and Maintaining TRM 800-Series Treadmills
To thread cables through the frame:
1. Feed the cable assembly downward through the left-hand
upright support and out through the opening in the lower
end of the support. Drape the remaining cable over the
front of the support and tape it into place if necessary to
secure it temporarily.
2. Feed the cable assembly through the grommet in the
left-hand side bracket of the base frame. Connect the
individual cables as shown in the following illustration and
table.
Figure 8: Cable connections and mounting points in the
treadmill base
Table 1. Cable connections and mounting points in the
treadmill base
Component Appearance Lower connection
point
Base unit data
cable
Flat with silver insulation
Ethernet cable Flat with black insulation

Table of Contents

Other manuals for Precor P20 Console

Related product manuals