Page 10 For generator technical questions, please call 1-800-444-3353.
For engine technical questions, please call 1-800-520-0882.
ITEM 61169
SAFETY OPERATION MAINTENANCESETUP
5. Allow the Engine to run for
several seconds. Then, if the Choke Lever
is in the START position,
move the Choke Lever very slowly
to its RUN position.
Note: Moving the Choke Lever too fast
could stall the Engine.
IMPORTANT: Allow the Engine
to run at no load for five minutes
with no load after each start-up so
that the Engine can stabilize.
6. Wait for the OUTPUT light to light up.
Break-in Period:
a. Breaking-in the Engine will help to ensure proper equipment and Engine operation.
b. The break-in period will last about 25 hours of use.
DO NOT exceed 75% of the Generator’s rated capacity during this period.
• Change the Engine oil after this period.
Under normal operating conditions subsequent maintenance follows
the schedule explained in the MAINTENANCE section.
Nominal 12VDC Output
1. Do not use any 120V~ outlet
while using the 12VDC outlet.
2. Only use the 12VDC receptacle to
charge a 12 volt lead-acid type battery
using an appropriate charge controller.
(Battery and controller not included.)
The 12VDC output is not regulated.
3. Do not connect any device to the 12VDC
terminal that draws more than 8 amps.
4. If this 12VDC circuit protection is tripped,
reduce the load, and press
the red Reset Button next to the outlet.
STARTRUN