Page 13 of 20
Attach second outer gable to stabilizers with JCB connectors
STEP 10
Estimated Time: 10 minutes
Secure the gable in place with connectors, but don’t
fully tighten
10a
10b
Ensure the slats are set inside the u-channel and that
they haven’t pulled out of the first outer gable.
10c
Firmly tighten the connectors