EasyManua.ls Logo

Prepac Queen - Stabilizer Preparation and Identification; Identify Stabilizer Types; Insert JRN Nuts into Stabilizers

Prepac Queen
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 7 of 20
B3
STEP 5
Estimated Time: 5 minutes
Insert JRN nuts into the holes on each end
of the upper (B3) and lower (B4) stabilizers.
B4
Identifying the upper and
lower stabilizers
Upper Stabilizers
Lower Stabilizers
Lower Stabilizers
Side hole is close to
the finished edge
Upper Stabilizers
Side hole is
close to the
UNFINISHED
edge
Top edge
(FINISHED) is
rounded

Related product manuals