M-62-04 SHC-1.4-61RQH-R-0070 Manual
Revision - Date: 02 – 09/23/2015
16
OPERATION (CONTINUED):
Cleaning:
This Process Technology SHC inline heater was cleaned before shipment. However, cleaning
is typically required to remove any contaminants remaining after installation. The times
required for cleaning of the system are dependent on DI water quality, flow rates, and
installation techniques, and will vary. Additional steps may be required for some applications.
1) Operate the SHC inline heater at ambient temperature for several hours, overnight if
possible, at the maximum flow rate of 300 ml/min (0.079 gpm).
Small amounts of process chemistry may remain in
the unit after draining. The unit should be flushed
with hot water then drained several times to
eliminate any residual chemistry.
Maintenance:
Preventative Maintenance of the Inline Heater Chamber:
The Process Technology SHC inline heater requires minimal preventive maintenance.
The process inlet/outlet fittings should be checked for leaks every Six Months.