ProMinent
®
Page 19
Table of Contents
Please read the operating instructions through completely
before commissioning this in-line probe housing!
Do not discard!
The operator shall be liable for any damages caused by
installation or operating errors!
Identity Code Ordering System For In-Line Probe
Housing Modules 20
General Notes for the User 21
1 About the In-Line Probe Housing 21
2 Safety 21
3 Description of Component Function 22
4 Storage and Transport 23
5 Assembly and Installation 23
5.1 Assembly 23
5.2 Hydraulic Installation 25
5.3 Electrical Installation 26
6 Commissioning the DGMa 26
6.1 Setting the Flow 26
6.2 Setting the Switch Point of the Flow Sensor 26
6.3 Calibrating the Sensors 27
6.4 Replacing/Adding Modules 27
7Troubleshooting 29
8 Disposal 30
9Technical Data 30
9.1 Flow Modules 30
9.2 Flow Sensor 31
10 Replacement Parts and Accessories 31
11 Scale Drawing 32
12 List of Replacement Parts 33
BA_DTZ_020_03_10_4spr.p65 31.10.2011, 13:53 Uhr19