PLC Startup Procedure
Start-Up Procedure
_____ 1. With the power “o ”, set the switch on the control
board to the “Stand-by” position (the control board
is located within the humidi er control panel door).
_____ 2. Make sure the manual drain valve lever (located
on the front of the drain valve) is in the “automatic”
position.
_____ 3. Turn the controlling humidistat to the lowest
setting (no call for humidity).
_____ 4. Turn the electric power “on” to the humidi er.
The “Power” LED light on the controller should be
illuminated.
_____ 5. Set the switch on the control board to the
“Normal” position.
_____ 6. Open the water supply on/o control valve (by
others) and allow the humidi er evaporating
chamber to ll to the proper level.
_____ 7. After the humidi er is full of water, the “Water
Level Full” LED will illuminate. Turn the humidistat
up to call for humidi er demand.
_____ 8. Make sure all the optional safety switches are
satis ed (air ow proving switch, high-limit
humidistat, etc).
_____ 9. The heater(s) should energize on a call from the
humidistat.
_____ 10. Verify the low water safety circuit by closing the
water supply and opening the manual drain
lever on the drain valve. As the humidi er tank is
draining, the “Water Level Full” and “Heater
Energized” lights should go out and you should
hear the contactor drop out when the low water
level is reached; this indicates the low water
safety circuit is operational. This should only take a
couple of minutes maximum.
_____ 11. Close the drain valve and allow the humidi er
to ll to the proper level.
_____ 12. Check operation of optional eld-installed
safety switches (air ow proving switch, high-limit
humidistat, etc.) to make sure that they turn the
power o to the control circuit power. The safety
switches should shut o the humidi er heaters
whenever one or more of the optional safety
switches create an “open circuit”.
_____ 13. Check heater amperage draw by testing and
recording voltage and amperage in each phase.
Readings should match the factory heater
nameplate.
Amps A:_______ Amps B:______ Amps C:______
_____ 14. Inspect installation for leaks by operating
humidi er at a full rolling boi. This may take up to
15 minutes from a cold start. Any leaks should
be sealed. Just tightening a pressure clamp
will not work if the gasket is not properly positioned
between the sealing surfaces. If necessary, remove
the cover, reseat gasket, and replace the cover.
A small amount of adhesive (super glue,
gorilla glue, spray adjesive, etc) to hold the gasket
in place while repositioning the cover will aid in this
process.
_____ 15. After the unit is producing steam, check and
retighten all hose clamp connections in the system
and make sure they are torqued to 35-40 in-lbs.
There are 6 clamps total inside the cabinet.
Signature:_______________________ Date:_________

Other manuals for Pure Humidifier EC-15

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Pure Humidifier EC-15 and is the answer not in the manual?

Pure Humidifier EC-15 Specifications

General IconGeneral
BrandPure Humidifier
ModelEC-15
CategoryHumidifier
LanguageEnglish

Related product manuals