Overheating protection
This product is equipped with a non- self- resetting overheating protection. When the
temperature control system of the electric boiler is out of control, or other
malfunctions cause the water temperature to rise, the overheating protection device
will immediately turn o the power and stop heating when the set temperature is
reached.
Packing list
Name
Quantity
Name
Quantity
Electric boiler
1 piece
Operating manual
1 piece
Safety valve
1 piece
Drain hose
1 piece
Hanging brackets
2 pieces
Sealing cap with
mesh
1 piece
Expansion bolts
4 pieces
Installation specication
The electric water heater must be installed by professional installation personnel in
accordance with the requirements of the national standard for the installation of electric
water heaters.
Installation preparation
1) Professional installation personnel should prepare installation tools and necessary
measurement qualied inspection instruments.
2) Check that the electric boiler is in good condition and that the accompanying
documents and accessories are complete.
3) Please read the instruction manual carefully to understand the function, operation
method, installation requirements and installation method of the electric water
heater to be installed.
4) Check the Power Supply in advance, a 220V-240V ~ 50-60Hz power supply should
be used. The electrical connection of the electric water heater will generally adopt a
special branch, and the capacity will be greater than 1.5 times of the maximum
current value of the electric water heater. The separate permanent socket must be
installed in a safe place where there is no risk of electric shock and where water
cannot splash. The separate xed socket used by the electric water heater should
be checked by visual inspection and special measuring equipment (phase meter,
test probe , earth resistance meter, etc.) to ensure that the live wire and the neutral
wire are installed correctly and reliably are grounded. Carefully check that the
capacity of the electric energy meter, the wiring and the separate xed socket meet
the requirements of the electric boiler. Check the water pressure of tap water with a